НАШ ЗАВОД СТРОИТ ЗАВОДЫ

DOME STRUCTURES



DOME STRUCTURES

SUPPORTS OF POWER LINES



SUPPORTS OF POWER LINES

STEEL STRUCTURES OF LL TYPES OF INDUSTRIAL CRANES



STEEL STRUCTURES OF LL TYPES OF INDUSTRIAL CRANES

BRIDGE STEEL STRUCTURES AND CONVEYOR LINE



BRIDGE STEEL STRUCTURES AND CONVEYOR LINE

GAZ DUCTS, RESERVOIRS AND VESSELS UNDER PRESSURE



GAZ DUCTS, RESERVOIRS AND VESSELS UNDER PRESSURE

Production of steel structures for

DAL HEAVY INDUSTRIES

POWER ENGINEERING

Power transmission towers; connecting elements and suspension fittings for wires; transformer feeder pillars...

more
DAL HEAVY INDUSTRIES

COMMUNICATION TECHNOLOGIES

Radio masts of cellular and radio communication; antennas; repeaters for telephone communication; terminals...

more
DAL HEAVY INDUSTRIES

ROAD BUILDING

Support, railings and noise-absorbing fences; superstructures of bridges...

more













DAL HEAVY INDUSTRIES

CONSTRUCTION

Frames of building systems; steel large-panel forms; front panels; rails...

more
DAL HEAVY INDUSTRIES

INDUSTRY

Details for agriculture and livestock sectors, cellulose industry; warehouses...

more
DAL HEAVY INDUSTRIES

CITY INFRASTRUCTURE

Curbstones; bridges; flagpoles; elements of advertising constructions; steel gratings...

more

PROFESSIONAL EQUIPMENT


FLANGE DRILLING MACHINE

BEAM DRILL LINES

BANDSAW WITH CNC

PLATE DRILLING MACHINE

ROLL HYDROLIC PLATE ROLL

BEAM WELDING LINES

H BEAM STRAIGHTENING MACHINE

OXY-FUEL CNC CUTTING MACHINE

PLASMA CUTTING MACHINE WITH WATER JET

AUTOMATIC SANDBLASTING MACHINE


more

About the project DAL HEAVY INDUSTRIES

The purpose of this project is to organize the production of metal structures for a wide range of purposes in the territory of "Angren" FEZ, by acquiring a land plot, building a modern high-tech plant, equipping it with modern equipment, and selling a wide range of metal structures both in the territory of the Republic of Uzbekistan and in neighboring countries. For the implementation of the project "from scratch" it is necessary to obtain a land plot and implement:

  • project works,
  • building and assembly works,
  • acquisition of imported process equipment certified in accordance with the international standards DIN EN ISO 9001 and ecological safety ISO-14000,
  • connection to the networks of the city (electricity, water supply and sewage, and gas supply lines)
  • personnel recruitment from resident population

Project initiator is the company “DAL TEKNİK MAKİNA TİCARET VE SANAYİ A.Ş.” (Turkey)

Full name --- Company “DAL TEKNİK MAKİNA TİCARET VE SANAYİ A.Ş.”
Country of Origin --- Turkey
Date of establishment or initial registration --- The company was established in 2006 in accordance with Turkish legislation
Date, place and number of the latest registration --- 04.01.2006, No. 574523
Organizational and legal form
Form of ownership --- Private
Legal address --- Turkey, Istanbul, Bahcelievler district, Mahalla Shirinevler, Adnan Kahveci boulevard No. 206, Heydar Ali Business Center, Block 1, Floor: 6 (Şirinevler Mah., Adnan Kahveci Bulvari No: 206)

On February 7, within the framework of Uzbek-Turkish Business Forum held in Istanbul, the Memorandum of Understanding between the Directorate of Angren FEZ and the director of DAL Teknik Makina Tigaret ve Sanayi A.S., Mr. Cevdet Dal, was signed on the project of the organization on the territory of Angren FEZ steel structures for industrial use. In the course of the talks, an agreement was reached on efforts on both sides to facilitate the organization of production of industrial and civil steel structures, power lines, solar panels, wind turbines, tower and bridge cranes, tanks, etc., with a capacity of 1000 tons/month.

In order to effectively implement the project, the following activities have been held:
1. Marketing research of the market for the sale of goods planned for implementation, which also includes the study and determination of the range of products offered by consumer segments;
2. Construction work was performed on the selected plot of land;
3. Carrying out of discussions, signing of contracts or other documents confirming the guarantee of work (deliveries of raw materials, placement of orders);
4. Organizational arrangements were made to equip the main production and auxiliary production facilities with equipment, machinery, equipment, etc.;
5. Organizational measures were taken to attract and train the staff;
6. The project has been implemented and it is working.